Azzahra, Shafa and Ainun, Siti (2024) LAPORAN PKM - IDENTIFIKASI TAHAP PERENCANAAN PEMBANGUNAN TEMPAT PENGOLAHAN SAMPAH BERBASIS 3R (REUSE, REDUCE, RECYCLE) T.A 2022. Project Report. LP2M Institut Teknologi Nasional Bandung, Bandung.
Text (IDENTIFIKASI TAHAP PERENCANAAN PEMBANGUNAN TEMPAT PENGOLAHAN SAMPAH BERBASIS 3R (REUSE, REDUCE, RECYCLE) T.A 2022)
252019045 SHAFA AZZAHRA_252019045.pdf Download (854kB) |
Abstract
This study aims to identify the planning stages of the development of 3R-based Waste Management Sites (Reduce, Reuse, Recycle) in the Citarum Watershed (DAS) in Cianjur Regency for Fiscal Year 2022. The evaluation was conducted to determine the suitability between the planning target of the Follow-up Work Plan (RKTL) and the realization in the field, including the completeness of the Community Work Plan (RKM) document at each TPS 3R. The research methodology included secondary data analysis, field surveys, and interviews with relevant parties. Results showed discrepancies in several stages of planning and deficiencies in document completeness. Recommendations are proposed to improve planning and enhance the functioning of TPS 3R in the future. Keywords: TPS 3R, planning, Community Work Plan (RKM), RKTL, Citarum
Item Type: | Monograph (Project Report) |
---|---|
Subjects: | T Technology > TD Environmental technology. Sanitary engineering |
Divisions: | 2 Fakultas Teknik Sipil dan Perencanaan > 25201 Teknik Lingkungan S1 |
Depositing User: | Asep Kamaludin |
Date Deposited: | 06 Sep 2024 07:10 |
Last Modified: | 06 Sep 2024 07:10 |
URI: | http://eprints.itenas.ac.id/id/eprint/2616 |
Actions (login required)
View Item |