FADHILAH, SALSYA ALIYA LAPORAN PKM - EVALUASI PENGELOLAAN LIMBAH B3 PADA PROYEK INSTALLATION ONSHORE PIPELINE PT. CITRA PANJI MANUNGGAL DI KELURAHAN LAWE-LAWE KAB. PENAJAM PASER UTARA (STUDI KASUS: WORKSHOP PEMBUATAN PIPA). Project Report. Institut Teknologi Nasional, Bandung, Bandung.
|
Text
252018091_EVALUASI PENGELOLAAN LIMBAH B3 PADA PROYEK INSTALLATION ONSHORE PIPELINE.pdf Download (470kB) | Preview |
Item Type: | Monograph (Project Report) |
---|---|
Subjects: | T Technology > TD Environmental technology. Sanitary engineering |
Divisions: | 2 Fakultas Teknik Sipil dan Perencanaan > 25201 Teknik Lingkungan S1 |
Depositing User: | Azizullah Putri Akbar |
Date Deposited: | 31 Jan 2024 03:26 |
Last Modified: | 31 Jan 2024 03:26 |
URI: | http://eprints.itenas.ac.id/id/eprint/2550 |
Actions (login required)
View Item |