Search for collections on Itenas Repository

TA: ANALISIS STABILITAS KONSTRUKSI BANGUNAN GEDUNG BERTINGKAT DENGAN METODE TIANG BOR DAN SISTEM DRAINASE BAWAH PERMUKAAN (STUDI KASUS: PROYEK PEMBAGUNAN GEDUNG DEKANAT UNISBA KOTA BANDUNG)

Ibrahim, Akbar Maulana (2019) TA: ANALISIS STABILITAS KONSTRUKSI BANGUNAN GEDUNG BERTINGKAT DENGAN METODE TIANG BOR DAN SISTEM DRAINASE BAWAH PERMUKAAN (STUDI KASUS: PROYEK PEMBAGUNAN GEDUNG DEKANAT UNISBA KOTA BANDUNG). Skripsi thesis, Institut Teknologi Nasional.

[img]
Preview
Text (Cover)
01 Cover 222015144.pdf

Download (456kB) | Preview
[img]
Preview
Text (Abstrak)
02 Abstrak 222015144.pdf

Download (151kB) | Preview
[img]
Preview
Text (Daftar Isi)
03 Daftar Isi 222015144.pdf

Download (253kB) | Preview
[img]
Preview
Text (Bab 1)
04 Bab 1 222015144.pdf

Download (92kB) | Preview
[img]
Preview
Text (Bab 2)
05 Bab 2 222015144.pdf

Download (1MB) | Preview
[img]
Preview
Text (Daftar Pustaka)
06 Daftar Pustaka 222015144.pdf

Download (53kB) | Preview

Abstract

Proyek Pembangunan Gedung Dekanat UNISBA Bandung dibangun di atas tanah lunak dengan letak kedalaman muka air tanah yang cukup tinggi. Salah satu solusi untuk meningkatkan daya dukung tanah dan menurunkan letak kedalaman muka air tanah adalah dengan menggunakan kombinasi perkuatan yang terdiri dari soldier pile, tiang bor dan sistem drainase bawah permukaan. Penelitian ini akan menitikberatkan analisis terhadap deformasi dan stabilitas bangunan gedung bertingkat dengan simulasi model menggunakan Plaxis 2D berbasis metode elemen hingga. Hasil penelitian dalam tugas akhir ini menunjukan pada kondisi kombinasi perkuatan terjadi penurunan pada sebesar 2,969 cm dengan nilai faktor keamanan (FK) sebesar 5,976. Hasil tersebut masih memenuhi syarat konstruksi yang berlaku. Oleh karena itu dapat disimpulkan bahwa nilai penurunan kombinasi perkuatan lebih kecil 80,206% dari syarat penurunan maksimum dan nilai faktor keamanan lebih besar 139,04% dari syarat minimal yang berlaku. Kata Kunci: Tiang bor, sistem drainase bawah permukaan, faktor keamanan, PLAXIS 2D Stability Analysis Of Multi-Storey Building Construction With Bored Pile Method And Subdrains (Case Study: UNISBA Bandung Dean Office Project), (Akbar Maulana I., NRP 22 2015 144, Mentor by Benny Moestofa, Ir., MAB., Civil Engineering, Faculty of Civil Engineering and Planning. National Institute of Technology Bandung) ABSTRACT The UNISBA Bandung Dean Office Project is built on soft soil with high groundwater level. One of the solution is to increase the bearing capacity as well as lowering the groundwater level of the soil using a combination of soldier pile, bored pile and subdrains. This research study will focus on the deformation and stability analysis of the multi-storey buildings using Plaxis 2D based on finite element methods. The results shows that in the combination of reinforcement condition the value of settlement of 2.969 cm, while the value of safety factor (SF) is 5.976. It can be concluded that the settlement in the combination of reinforcement is 80.206% smaller than the value of permissible settlement and the value of safety factor 139.04% more than the minimum value of required safety factor. Keywords: Bored pile, subdrains, safety factor, PLAXIS 2D

Item Type: Thesis (Skripsi)
Contributors:
ContributionContributorsemail
Thesis advisorMoestofa, BennyUNSPECIFIED
Divisions: 2 Fakultas Teknik Sipil dan Perencanaan > 22201 Teknik Sipil S1
Depositing User: Asep Kamaludin
Date Deposited: 27 Aug 2019 03:16
Last Modified: 11 May 2021 02:52
URI: http://eprints.itenas.ac.id/id/eprint/498

Actions (login required)

View Item View Item